Soil Filling & Land Levelling Cost Calculator

Volume of earth needed to raise or level a plot, in cubic feet, cubic meters, brass and truckloads, with cost.

Inputs

%
Rates
/ brass
₹ 3 Thousand
brass
/ hr
₹ 1.2 Thousand
cu m / hr
/ sq ft
Total filling & levelling cost
₹1,99,200
60 brass · 18 truckloads · ₹83 per sq ft
Volume (loose)
6,000 cu ft
Cubic meters
169.9
Brass
60
JCB hours
6

Cost summary

Soil: 60 brass × ₹3,000
₹1,80,000
Spreading: 6 hr × ₹1,200
₹7,200
Compaction: 2,400 sq ft × ₹5
₹12,000
Total
₹1,99,200

Net compacted volume: 4,800 cu ft. Loose volume includes 25% allowance.

How this calculator works

Loose soil compacts, so you need more than the geometric volume — typically 20–30% extra. 1 brass = 100 cubic feet. A typical tipper carries about 10 cubic meters (~3.5 brass).

Was this helpful?

Rate this calculator